TestScenario is a new XML-based system to reuse unit tests as regression tests, functional tests, load tests, integration tests, and service monitors requiring no coding.
使用一个新的基于XML的系统——TestScenario——来重用单元测试进行回归测试,功能测试,负载测试和服务监控,无需额外编码。
The existing problems and influencing factors of the reheated steam control system of No. 4 Unit in Zhangjiakou Power Plant are presented.
介绍了河北省张家口发电厂4号机组再热汽温调节系统存在的问题及其影响因素。
The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
On-line performance monitoring system for 300MW heat-supply unit in Taiyuan NO.
太原一电厂300MW供热机组性能在线监测系统的开发。
The leakage in vacuum system of steam turbine for unit no. 4 in Zhangze Power Plant decreased thermal efficiency of said unit.
漳泽发电厂4号机组汽轮机真空系统泄漏,降低了机组热效率。
The system has been put into use on the No. 2 unit of Beilun Power Plant. It can effectively direct the practical start-stop operations which meets the purpose of operational optimization.
该系统已经在北仑发电厂2号机组投入运行,有效指导机组启停,达到了优化运行的目的。
The turbine was in trip in No. 1 power unit, Luoding power Plant, Guangdong because of low oil pressure in several times in the process of one stroke of EH oil pressure in DEH speed adjusting system.
广东罗定电厂1号机组DEH调速系统EH油压在一次冲转过程中,多次出现因为油压低,导致汽轮机跳闸。
This lidar system allows three-dimensional measurements by using a steering unit, and can measure four kinds of pollutants in atmosphereaerosol, SO 2, NO 2, and O 3.
该雷达系统能监测四种大气污染物,即大气气溶胶、二氧化硫、二氧化氮和臭氧。
In this paper, the author introduced the fixed value setting of underexcited limitation in ABB excitation system. And also analyzed the condensive operation of No. 1 generating unit.
介绍ABB公司励磁系统低励限制的定值整定,分析北京热电分公司1号发电机进相运行时的动作情况以及ABB励磁系统低励限制与失磁保护之间的关系。
The suction is provided by a suction unit of the side channel blower type, with direct coupling between the fan and the motor shaft and no transmission system.
吸尘系统是旁路鼓风马达,是由风扇和马达轴直联而成,没有传输装置。
The unit uses field proven multi-redundant design to ensure there is no single point of system failure.
模块使用区域经过多种设计以保证系统没有一点故障。
The pure electronic hydraulic control of No. 5 200 MW generating unit in Jingmen Cogeneration Power Plant is realized by retrofitting the original hydraulic governing system using DEH.
荆门热电厂采用数字电液调节系统(DEH)对5号机组原有液压调节系统进行改造,实现了汽轮机纯电调控制。
The pure electronic hydraulic control of No. 5 200 MW generating unit in Jingmen Cogeneration Power Plant is realized by retrofitting the original hydraulic governing system using DEH.
荆门热电厂采用数字电液调节系统(DEH)对5号机组原有液压调节系统进行改造,实现了汽轮机纯电调控制。
应用推荐