No screen real estate is wasted to give you quick access to commonly used commands and activities and to control and modify your project and solutions.
屏幕上的每一块区域都可以让你快速访问到常用的命令,执行常用的操作以及对项目和解决方案的控制与修改。
A mock is a "fake" object that allows you to focus on testing important features within the scope of the Rails project, rather than on interactions with external systems that you have no control over.
mock是一个“伪”对象,它让我们能够集中精力测试Rails项目范围内的重要特性,而不必关注与无法控制的外部系统的交互。
Abstract: Design stage is a key link of project cost control, but there is no appropriate method which is advanced in theory and easy in operability.
摘要设计阶段是项目成本控制的关键环节,但该阶段成本控制缺乏理论先进、操作性强的方法。
The intention of the project management is to schedule, organize and control all activities to achieve the project goal eventually. No matter how difficult it is and what kind risks are there.
项目管理的目的是计划、组织并控制所有的活动以达到困难重重和极具风险的情况下仍能成功而顺利地完成一个项目目标。
There are many issues that arise in large project there many issue that no one has control over.
在一个大的工程中会有很多的问题出现,而且不在人们的可控范围之内。
In order to appraise the quality testing of grout curtain, digital borehole camera technology is applied to three boreholes of the grouting gallery no. 3 in Xiaolangdi Water Control Project.
为了评价帷幕灌浆效果,将数字钻孔摄像技术应用到小浪底水利枢纽3号灌浆洞3个灌浆质量检查孔中。
This study was supported by the Open Project Program of Key Laboratory of Drug Quality Control and Pharmacovigilance China Pharmaceutical University, Ministry of Education No.
同时,论文中应注明“药物质量与安全预警教育部重点实验室(中国药科大学)资助项目(编号:)”;或。
This study was supported by the Open Project Program of Key Laboratory of Drug Quality Control and Pharmacovigilance China Pharmaceutical University, Ministry of Education No.
同时,论文中应注明“药物质量与安全预警教育部重点实验室(中国药科大学)资助项目(编号:)”;或。
应用推荐