• No-wait flow shop scheduling problems with total flow time minimization is an important manufacturing system widely existing in industrial environments.

    完工时间目标的无等待流水车间调度问题一个重要制造加工系统广泛应用于工业生产中。

    youdao

  • No-wait flow shop problem is one of flow shop problems, and is a typically NP-complete problem, which means that it is impossible to find the global optimum in polynomial complexity.

    等待问题流水车间调度中的种,是一类典型NP完全问题,已证明多项式时间内得不到值。

    youdao

  • A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    youdao

  • A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定