This paper discusses an optimization method to determine the minimum cost scheduling in network schedule by means of fuzzy linear programming.
本文提出用模糊线性规划求解网络计划最低费用日程的优化方法。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
Project network technique is presently a frequently-used method to make project schedule plan.
目前,工程项目进度计划的编制多采用网络计划方法。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。
Authors design the maintenance processes, compile the operation schedule by Gantt chart and network diagram and analyze the schedule by deflection analysis method.
作者对检修过程进行流程设计,提出利用甘特图、网络图编制进度安排,利用偏差分析法对进度进行分析。