Currently, in the actual production, MRP system is calculated on a time span through sub-total demand and net demand, and to express the demand for materials with the intermittent time series.
目前,在生产实际中,MRP系统是通过计算按时间分段的总需求和净需求,并以间断的时间序列来表达对物料的需求。
Currently, in the actual production, MRP system is calculated on a time span through sub-total demand and net demand, and to express the demand for materials with the intermittent time series.
目前,在生产实际中,MRP系统是通过计算按时间分段的总需求和净需求,并以间断的时间序列来表达对物料的需求。
应用推荐