• This paper introduces the revision and main revised contents of the national code for construction and acceptance of concrete building structures.

    本文主要介绍混凝土结构工程施工验收规范修订情况及主要修改内容

    youdao

  • This paper introduces the main contents and their background of the national code for design, construction and acceptance of lift-slab structures.

    本文介绍国家标准《升板建筑结构设计施工验收规范》(报批稿)主要内容编制情况。

    youdao

  • Existing valuation method of highway construction works tendering is based on bill of quantity. It is the same as national standard Code of valuation with bill quantity of construction work.

    公路工程现行招投标计价方法是以工程量清单为基础的计价模式,本质上作为国家标准的《建设工程工程量清单计价规范一致的。

    youdao

  • Existing valuation method of highway construction works tendering is based on bill of quantity. It is the same as national standard Code of valuation with bill quantity of construction work.

    公路工程现行招投标计价方法是以工程量清单为基础的计价模式,本质上作为国家标准的《建设工程工程量清单计价规范一致的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定