This paper shows the incompatability of system structure of the model of the network diagram, thus realizes the demonstration that algorithm for the total float of A on N and A on A is mistaken.
本文揭示了传统网络构图模型系统结构的不相容性,从而实现了传统网络总时差的计算是错误的论证。
This paper shows the incompatability of system structure of the model of the network diagram, thus realizes the demonstration that algorithm for the total float of A on N and A on A is mistaken.
本文揭示了传统网络构图模型系统结构的不相容性,从而实现了传统网络总时差的计算是错误的论证。
应用推荐