• It makes fissure occupation in reason and at the same time guarantee the construction success by using multistage ladder sand-franc technique.

    采用多级阶梯加砂压裂技术,使裂缝充填合理同时保证压裂施工成功

    youdao

  • Firstly, general ideas and construction process of accumulative slippage technology were introduced, as well as corresponding design and calculation, multistage loading and slipping control measures.

    介绍累积滑移技术总体思路施工流程相关设计计算及分级加载滑移施工控制措施。

    youdao

  • Firstly, general ideas and construction process of accumulative slippage technology were introduced, as well as corresponding design and calculation, multistage loading and slipping control measures.

    介绍累积滑移技术总体思路施工流程相关设计计算及分级加载滑移施工控制措施。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定