• To counter the complicated geologic conditions of Dayuandu Junction Project, multiple foundation treatment measures were taken. The design and construction of foundation treatment are introduced.

    大源渡枢纽工程地质条件较复杂,采用了多种地基处理措施,对其地基处理的设计施工进行介绍。

    youdao

  • The elastic PBD blocks of the backbone bridge adjacent PS domains through multiple junction points, resulting in the enhanced elastomeric properties.

    主链上弹性PB D通过多个联结点与相邻PS微区连接,提高了弹性体性能

    youdao

  • The elastic PBD blocks of the backbone bridge adjacent PS domains through multiple junction points, resulting in the enhanced elastomeric properties.

    主链上弹性PB D通过多个联结点与相邻PS微区连接,提高了弹性体性能

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定