The experimental results show that the scheduling algorithm based on multiobjective combinational optimization method is better than those heuristic scheduling algorithms.
仿真实验结果表明,基于多目标优化方法的调度算法在多数性能指标上均比启发式调度算法更具优势。
The experimental results show that the scheduling algorithm based on multiobjective combinational optimization method is better than those heuristic scheduling algorithms.
仿真实验结果表明,基于多目标优化方法的调度算法在多数性能指标上均比启发式调度算法更具优势。
应用推荐