• The deficiency of the currently exist flexible electrical network planning, such as multi-scenario method, blind number planning, selected probability method are analyzed.

    分析了场景规划技术、规划、线路被概率电网灵活规划现有方法所存在问题和不足

    youdao

  • Based on the multi - scenario probability method, the uncertain factors, such as wind farm power output, load change and economy, are described by scenario analysis and probability calculation.

    应用场景概率方法,将风电场输出功率电网规划中涉及到的负荷变化经济不确定性因素,以场景分析概率计算的方式加以描述。

    youdao

  • Based on the multi - scenario probability method, the uncertain factors, such as wind farm power output, load change and economy, are described by scenario analysis and probability calculation.

    应用场景概率方法,将风电场输出功率电网规划中涉及到的负荷变化经济不确定性因素,以场景分析概率计算的方式加以描述。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定