Besed on the analysis of technology and market uncertainty of R&D project, a multi-step quadranomial option pricing model is presented for valuing an ongoing R&D project.
在分析R&D项目技术和市场不确定性分布特征的基础上,提出多步骤四项式期权定价模型,用于R&D项目进展评估。
Based on an actual project of local demolition column, the concept design of multi-story building renovation, some detail construction and stress analysis of the trimmer are introduced.
结合一综合大楼抽柱改造工程,介绍高层框架结构抽柱改造设计中有关概念设计和构造处理方法及托梁内力的电算分析。可供类似工程参考。
The multi-dimensional nature of project management causes repeated feedback loops for additional analysis.
项目管理的多维性要求不断地重复反馈,以使分析工作量不断增加。
A suspension bridge project is taken as an example, in which the evolution of critical wind speed of flutter during bridge erection is studied by a multi-mode flutter analysis approach.
以某悬索桥设计方案为工程背景,应用多模态颤振分析方法,分析了该桥架设阶段颤振临界风速的发展趋势。
This project analysis the relationship of different economy member and economy growth, we conclude that multi-economy is more benefit to the economy growth than single-economy.
本文从不同经济成分与经济增长关系的分析,得出了多种经济成分比单一经济成分更有利于经济增长等结论;
Seismic risk analysis of some research areas in Urumqi City have been made with method of multi-project dividing potential source, and two sets of mature projects have been developed.
用多方案划分潜在震源区的方法对乌鲁木齐市某场地研究区进行地震危险性分析,可在研究区内划分出两套较成熟的潜在震源区方案。
In the second chapter, the basic idea of MC-oriented multi-project management is set forth on the basis of analysis of characteristic of mass customization and operation flow of the enterprise.
第二章首先分析了面向大批量定制多项目并存生产的企业业务流程和面向大批量定制多项目并存生产的特征,并提出了面向大批量定制多项目并存管理的基本思想。
The transient analysis model is applied to the Shanghai Hongqiao transport hub's multi-echelon excavation project, the dewatering and excavation process were simulated based on the practical work.
将瞬态分析的流固耦合有限元模型应用于上海虹桥枢纽多级梯次基坑计算中,参照设计方案,对降水、开挖、支护等一系列工况进行模拟。
Therefore based on primary conclusion we continued analyzing project core competence. After the analysis we deemed multi-action relation between corporation core competence and project is tide.
因此,在此初步结论基础上,继续展开了项目核心能力分析,通过分析认为公司与项目之间的核心能力互动关系较为紧密。
In this thesis, choosing the commonly used multi-span empty arch bridge as project background. carry out the seismic response with the finite element analysis software ANSYS.
本文以某多跨悬链线空腹式拱桥为工程背景,以大型有限元分析软件ANSYS为平台,对该桥进行地震反应分析。
In this thesis, choosing the commonly used multi-span empty arch bridge as project background. carry out the seismic response with the finite element analysis software ANSYS.
本文以某多跨悬链线空腹式拱桥为工程背景,以大型有限元分析软件ANSYS为平台,对该桥进行地震反应分析。
应用推荐