As the results of calculation and simulation accord with the experimental data, criterion for identifying power switching pot and switching time of the energy saving motor is offered.
计算和仿真结果与实验数据相吻合,这为节能电机功率切换点和切换时间的确定提供了依据。
The finished rotor and stator unit is then assembled into a central motor housing unit. The motor assembly is then subjected to a High-Potential (Hi-Pot) Test.
转子和定子成品然后装配进中央电机壳装置内。随后电机总成需经过高电压测试。
The finished rotor and stator unit is then assembled into a central motor housing unit. The motor assembly is then subjected to a High-Potential (Hi-Pot) Test.
转子和定子成品然后装配进中央电机壳装置内。随后电机总成需经过高电压测试。
应用推荐