In the next example, the previous query is modified, by adding an ORDER by siblings clause to get the siblings in the result sorted by NAME.
在下一个示例中,会修改以前的查询,添加一个ORDERBYsiblings子句,从按照NAME排序的结果中获取同级查询结果。
In Update 1, and many other typical use cases, the return clause simply returns the variable that holds the modified document.
在更新1和其他许多典型场景中,return子句仅仅返回包含修改后的文档的变量。
Finally, the return clause returns the new node representing the scheduled termination date so that DB2 will update data in the DOCUMENT column with the modified data.
最后,return子句返回代表预定终止日期的新节点,所以DB 2将用修改后的数据更新document列中的数据。
RETURN: The return clause returns the modified values.
return:return子句返回修改后的值。
But the exception parameter t is declared as a Throwable, and Throwable cannot be thrown from foo unless the throws clause is modified.
但是异常参数t被声明为Throwable,且如果没有修改throws子句,则Throwable不能从foo中抛出。
As another example, Update 29 USES the COPY clause to only get the customer's address, and the RETURN clause to embed the modified address in a new "sendto" element.
更新29给出另一个示例,它使用COPY子句只获取客户的地址并在return子句中把修改后的地址嵌入新的“sendto”元素。
In some cases, jointly developed the economic aspects of the plan can be modified in the contract of guarantee clause or field service terms.
在有些情况下,共同制定经济方面的计划可以修正合同中的担保条款或现场服务的条款。
Subject to Clause 24 hereof, no tender may be modified subsequent to the deadline for submission of tenders.
按条款二十四的规定,任何标书在最后期限后不能再进行修改。
The federal differing site conditions (DSC) clause, or a slightly modified version, is used in most construction contracts.
关于不同场地条件(DSC) 的联邦条款,或者稍微修改后的该条款应用于大多数的工程合同。
The federal differing site conditions (DSC) clause, or a slightly modified version, is used in most construction contracts.
关于不同场地条件(DSC) 的联邦条款,或者稍微修改后的该条款应用于大多数的工程合同。
应用推荐