As reference, some Suggestions are put forward for the model acceptance tests in the South-to-North Water Project to be similar with this pumping station.
同时,根据该试验验收过程提出了南水北调工程中泵站装置验收需要考虑的若干建议,供其它类似泵站试验验收参考。
As reference, some Suggestions are put forward for the model acceptance tests in the South-to-North Water Project to be similar with this pumping station.
同时,根据该试验验收过程提出了南水北调工程中泵站装置验收需要考虑的若干建议,供其它类似泵站试验验收参考。
应用推荐