• The management information system of mine enterprise has close relationship with mining engineering, mine management and computer technology.

    矿山企业信息系统矿山工程、矿山管理计算机技术密切相关。

    youdao

  • The system was applyed in the design for the mining engineering, the manufacture management, the scientific research and the teaching. It bring the favorable effect moreover.

    系统采矿工程设计生产管理科研教学进行使用效果良好

    youdao

  • The hydraulic hinged joint steering system now finds wide use in front—loading machinery, heavy truck and self—propelled mining and engineering vehicles.

    目前前端式装载机、大型车辆其它自行式矿山工程机械广泛地采用了液压传动的铰接转向方式

    youdao

  • The hydro-pneumatic suspension (HPS) system can meet the need of mining engineering vehicles very well because of its advanced nonlinear characteristics and shock-absorption performance.

    油气系统由于优越的非线性弹性特性良好性能能够较好地满足矿山工程车辆要求

    youdao

  • By way of the engineering practice in Zhahe mining area, the method raising the well capacity in the karst containing water system under the suitable hydrogeology condition was introduced.

    通过淮北闸河矿区工程实践,介绍了适宜水文地质条件下,利用爆破方法提高岩溶含水系统水井出水量方法

    youdao

  • According to the engineering geological conditions of mining area, the slope stability of Miaogou Iron Mine has been analyzed by means of the intelligent system of slope stability.

    根据庙沟铁矿矿区工程地质条件,采用自行编制边坡稳定分析集成智能系统对该矿进行了边坡稳定性分析。

    youdao

  • It analysed the problem system on the optimal design in mining engineering.

    最后讨论了矿山工程设计问题系统

    youdao

  • Oriented toward the development of a 3D visual modeling system for geological and mining engineering, a voxel- based algorithm for computing underground excavation volume is proposed.

    根据地矿工程化仿真系统研究工作需要,提出一种基于体素的地下采掘工程量计算方法

    youdao

  • Take CRISP-DM as guide principle, we divide data mining into 6 steps from business perspective. At last, this text desighned a data mining system for civil engineering estimation.

    “跨行业数据挖掘过程标准”(CRISP-DM)指导准则商业角度土建工程概算的数据挖掘过程6个阶段有效的执行。

    youdao

  • Take CRISP-DM as guide principle, we divide data mining into 6 steps from business perspective. At last, this text desighned a data mining system for civil engineering estimation.

    “跨行业数据挖掘过程标准”(CRISP-DM)指导准则商业角度土建工程概算的数据挖掘过程6个阶段有效的执行。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定