The management information system of mine enterprise has close relationship with mining engineering, mine management and computer technology.
矿山企业信息系统与矿山工程、矿山管理、计算机技术密切相关。
The system was applyed in the design for the mining engineering, the manufacture management, the scientific research and the teaching. It bring the favorable effect moreover.
该系统在采矿工程设计、生产管理和科研教学中进行使用,效果良好。
The hydraulic hinged joint steering system now finds wide use in front—loading machinery, heavy truck and self—propelled mining and engineering vehicles.
目前,在前端式装载机、大型车辆及其它自行式矿山和工程机械上广泛地采用了液压传动的铰接转向方式。
The hydro-pneumatic suspension (HPS) system can meet the need of mining engineering vehicles very well because of its advanced nonlinear characteristics and shock-absorption performance.
油气悬架系统,由于其优越的非线性弹性特性和良好的减振性能,能够较好地满足矿山工程车辆的要求。
By way of the engineering practice in Zhahe mining area, the method raising the well capacity in the karst containing water system under the suitable hydrogeology condition was introduced.
通过淮北闸河矿区的工程实践,介绍了在适宜的水文地质条件下,利用爆破方法提高岩溶含水系统中水井出水量的方法。
According to the engineering geological conditions of mining area, the slope stability of Miaogou Iron Mine has been analyzed by means of the intelligent system of slope stability.
根据庙沟铁矿矿区工程地质条件,采用自行编制的边坡稳定分析集成智能系统对该矿进行了边坡稳定性分析。
It analysed the problem system on the optimal design in mining engineering.
最后讨论了矿山工程最优设计的问题系统。
Oriented toward the development of a 3D visual modeling system for geological and mining engineering, a voxel- based algorithm for computing underground excavation volume is proposed.
根据地矿工程体视化仿真系统研究工作的需要,提出了一种基于体素的地下采掘工程量的计算方法。
Take CRISP-DM as guide principle, we divide data mining into 6 steps from business perspective. At last, this text desighned a data mining system for civil engineering estimation.
以“跨行业数据挖掘过程标准”(CRISP-DM)为指导准则,从商业的角度将土建工程概算的数据挖掘过程分6个阶段有效的执行。
Take CRISP-DM as guide principle, we divide data mining into 6 steps from business perspective. At last, this text desighned a data mining system for civil engineering estimation.
以“跨行业数据挖掘过程标准”(CRISP-DM)为指导准则,从商业的角度将土建工程概算的数据挖掘过程分6个阶段有效的执行。
应用推荐