This paper discusses an optimization method to determine the minimum cost scheduling in network schedule by means of fuzzy linear programming.
本文提出用模糊线性规划求解网络计划最低费用日程的优化方法。
Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule.
给出项目任务的成本和时间数据,六西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。
Give cost and time data for project tasks, the Six Sigma Black Belt should be able to compute the cost of normal and crash schedules and the minimum total cost schedule.
给出项目任务的成本和时间数据,六西格玛黑带应能计算出正常的和紧急加快的生产费用表以及最小的生产总费用表。
应用推荐