• Then there is reheating furnace, reducing mill and cooling table.

    然后进入再炉、径机冷却床。

    youdao

  • In August, Australia's largest steelmaker, BlueScope, cited the Australian dollar as one reason for its decision to shut a blast furnace and a hot strip mill, at the cost of perhaps 1, 000 jobs.

    八月澳大利亚最大钢铁商,蓝璀钢铁(BlueScope)指出他们关闭个炼铁高炉热带轧机的一个原因就是澳元升值,结果是减少了1000个工作岗位

    youdao

  • Those who have seen a steel mill will know something of variety processes, from the blast-furnace onwards !

    参观炼钢厂都会炼钢的各个不同步骤有所了解就是高炉开始。

    youdao

  • Some negligence in design about discharge method of reheating furnace limit the speed and the output of PQF mill line.

    由于加热炉方式设计原因,限制PQF轧机生产线的轧制节奏,从而影响产量

    youdao

  • This Paper has described features and development trend of walking-beam type heating furnace in wide-heavy plate mill workshop and has also introduced the design of typical walking beam furnace.

    文章论述宽厚板轧机车间步进梁式加热炉特点发展趋势介绍典型的步梁式加热炉设计情况。

    youdao

  • The thermotechnical character measuring method and application technic for the walking beam heating furnace on 1780mm continuous thermal rolling mill production line of Anshan iron and steel group.

    介绍了鞍钢1780热连轧机组上下供热板坯步进梁式加热炉热工性能测试方法及其应用技术

    youdao

  • The main purpose of dispatching control at the wire rod mill is to keep the discharging pace of the furnace consistent with the rolling pace of the mill.

    高线调度控制主要任务控制加热炉出钢节奏轧机轧制节奏,使之保持一致

    youdao

  • In order to save energy sources and improve operational condition, the polycrystalline mullite fibre was tried using for the heating furnace of wire rod and bar mill in Xianggang.

    为了节约能源改善操作环境钢高线、棒材加热炉试用多晶莫来石纤维

    youdao

  • From the steel plant sent from the billet, first into the furnace, and then repeated after the beginning of rolling mill, into the finishing mill.

    炼钢厂过来连铸坯首先是进入加热炉然后经过轧机反复轧制之后,进入精轧机。

    youdao

  • The paper introduced the process of applying 10mw induction heating furnace to compensate temperature of welded tube before reducing mill, which is controlled by a micro-processor.

    介绍了英国钢铁公司科比厂在焊接钢管,采用一台由微处理器控制10MW感应加热炉进行温度补偿。

    youdao

  • The on-line slab temperature measurement for an industrial rolling mill reheating furnace is one class of typical hard-measuring problem in industrial process.

    针对轧钢加热炉典型工业生产过程 ,运用多元统计投影技术进行了故障检测与诊断的研究。

    youdao

  • In this paper, PCA and statistical control chart have been used to detect process operating faults on an industrial rolling mill reheating furnace.

    针对轧钢加热炉这类典型的工业生产过程运用多元统计投影技术进行故障检测与诊断的研究。

    youdao

  • This paper introduces the methods and the application technologies for testing thermodynamic performances of walking beam furnace heating slabs up and down Angang 1780 hot continuous rolling mill.

    介绍了鞍钢1 780热连轧机组上下供热板坯进梁式加热炉热工性能测试方法及其应用技术

    youdao

  • Continuous walking beam type reheating furnace is main heating equipment of heavy plate mill.

    步进加热炉宽厚板生产加热设备

    youdao

  • The principal aspects and effects of reconstruction and operation improvement of the reheating furnace at Yingkou Plate Mill are discussed.

    论述了营口中板加热炉结构改造操作改进基本内容效果

    youdao

  • The paper introduces the problems and solutions during the operation of the regenerative heating furnace in Coil Mill of Guanggang, and some advices of transformation are proposed.

    介绍广钢高线厂蓄热加热炉运行出现问题及处理方法并且提出一些改造建议

    youdao

  • This article introduces particularly the heating furnace plane arrangement and the heating furnace design of the 2160 rolling mill, as well as how to adapt the hot charge and delivery system.

    本文重点介绍2160热轧加热炉平面布置设计以及如何很好适应送的装料制度。

    youdao

  • In order to save energy and improve operational condition, the polycrystalline mullite fibre is used on the top of heating furnace in Continue Rolling Mill Plant of GIS.

    为了节约能源改善操作环境广钢连轧厂加热炉炉顶试用莫来石纤维

    youdao

  • Granule morphology of granulated blast furnace slag powders prepared with vertical mill (GBFS-V) and close circuit ball mill (GBFS-B) respectively were observed with SEM.

    采用扫描电镜对高炉矿渣粉体磨高炉矿渣粉体颗粒形貌进行观察

    youdao

  • Thistechnology can be widely applied to rolling mill reheating furnace and should be greatly promoted.

    该技术在轧钢加热炉广泛应用推广价值。

    youdao

  • The reheating furnace in hot strip mill had high energy consumption, low heating quality, high metal loss and high failure rate.

    针对热轧带钢加热炉能耗加热质量差、氧化烧损大、故障率高等问题进行技术改造,达到节能降耗的目的。

    youdao

  • The blast temperature is low in the first iron mill of jinan Iron and Steel Group Co… It becomes bottleneck of conditioning technique and economic target to elevate the blast furnace.

    济南钢铁集团总公司第一炼铁厂热风炉低,成为制约高炉技术经济指标提高瓶颈

    youdao

  • The practice of the process of top-bottom blowing converter-LF refining furnace-billet casting-high speed wire rod mill for producing special TS06 wire-drawing steel wire rod is briefly introduced.

    介绍了天利用顶底复转炉、LF精炼炉、方坯连铸高速线材轧机工艺生产ts06拉丝专用钢盘条实践

    youdao

  • Technics of typical grinding system of furnace slag and its advantages and disadvantages, especially a new grinding technology with standing mill are introduced.

    对粒化高炉矿渣典型工艺进行了介绍,比较了优缺点着重介绍了采用立式磨作为预粉磨设备的新型粉磨工艺技术

    youdao

  • For the furnace operation, optimistic heating patterns, billet spacing control depending on rolling mill production, prompt removal of slag on furnace bottom, utilization of industrial ve

    操作方面,论述了合理的加热制度、轧机产量的变化改变布料密度、及时清除炉底渣、工业电视装出料操作上的应用以及定期更换炉底砌砖等。

    youdao

  • For the furnace operation, optimistic heating patterns, billet spacing control depending on rolling mill production, prompt removal of slag on furnace bottom, utilization of industrial ve

    操作方面,论述了合理的加热制度、轧机产量的变化改变布料密度、及时清除炉底渣、工业电视装出料操作上的应用以及定期更换炉底砌砖等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定