The next station is Nanjing South Railway station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.
前方到站,南京南站,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。
We are now at Nanjing South Railway Station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.
南京南站到了,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。
The structure deformation of old metro station and ground settlement in proximity by vehicle contact load is analyzed during the deep excavation of nearby new transfer metro station.
分析了新建地铁车站深基坑开挖过程中既有车站内的轮轨接触荷载对车站结构及其周围土层变形的影响。
Due to the space restraint, new parallel transfer metro station will be built close to the old station.
由于受到场地限制,新建的地铁车站紧靠老地铁车站,形成平行换乘。
The results indicate that interior bus stops at metro station could effectively improve the transfer efficiency.
结果表明在地铁站厅层设置为地铁接驳的室内公交站点能有效地提高枢纽的换乘效率。
The results indicate that interior bus stops at metro station could effectively improve the transfer efficiency.
结果表明在地铁站厅层设置为地铁接驳的室内公交站点能有效地提高枢纽的换乘效率。
应用推荐