Typically, the individual tests and configuration points that are described below should only be run at the peak load level for an individual test for a maximum of 10 to 30 minutes.
一般来说,对于个别测试,您应该只在最大负载级别上运行下面描述的个别测试和配置点,运行时间最多为10至30分钟。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
By Changchun middle school elite middle distance runner increment load test, we get the maximum oxygen uptake and anaerobic threshold and the corresponding speed, heart rate.
对长春市中学优秀男子中长跑运动员进行递增负荷测试,得到其最大摄氧量和无氧阈及其对应的速度、心率。
The maximum load that the models can bear in the test meets the design load according to the structural similar theory.
试验结果与根据结构相似理论得出的结果相比较表明,模型受力性能较稳定,能承受最大荷载与理论计算的结果较吻合。
For example, the following illustration demonstrates how to specify the maximum test iterations for a Load test Scenario.
例如,下图示范如何指定负载测试情节的测试反复项目数目上限。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
应用推荐