The user can plan material requirements while respecting hard pegs on all supply orders and generate planned orders with Seiban references appropriately.
用户可以制定物料需求计划,同时考虑有关所有供应订单的硬溯源,并适当使用项目参考生成计划订单。
Aimed at the status of the iron bearing raw material in WISCO sintering plant, the supply source abroad and at home was analyzed. And the purchasing plan in the future was proposed.
从武钢烧结厂目前含铁原料使用现状入手,对国内外矿石资源及供应情况进行了分析,并提出了武钢烧结厂含铁原料未来的采购及使用趋势。
Aimed at the status of the iron bearing raw material in WISCO sintering plant, the supply source abroad and at home was analyzed. And the purchasing plan in the future was proposed.
从武钢烧结厂目前含铁原料使用现状入手,对国内外矿石资源及供应情况进行了分析,并提出了武钢烧结厂含铁原料未来的采购及使用趋势。
应用推荐