Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.
每一个工程技术更改必须由技术部以正式的文件及时通知质量,生产,材料部门。
Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.
进行新产品BOM(物料清单)表的建立与维护,根据工程变更或相关部门要求进行更新。
Provide monthly material usage analysis report to design dept for fine tuning of their design data.
每月向设计部门提供材料使用报告,设计部门再根据该报告对之进行微调。
If customer provide defined supplier name list, purchasing dept. firstly consider purchase related material from supplier.
如果顾客提供指定的供方名单,供应部应首先考虑从该供方处购买相关物资。
Qc preparation: cooperate with qc dept. To sampling the raw material.
质检准备:配合质量控制部门对原料进行取样。
Shane Smith, Manager - Global product management Dept. of Applied Material.
尚恩?史密斯,美国应用材料有限公司全球产品管理部经理。
Shane Smith, Manager - Global product management Dept. of Applied Material.
尚恩?史密斯,美国应用材料有限公司全球产品管理部经理。
应用推荐