How is master scheduling and shop floor control accomplished?
主要作业表和车间控制是怎么完成的?
To be responsible for the daily procurement to master scheduling and expedite the contract delivery to master scheduling and orders.
负责根据主计划的要求进行日常采购工作。并负责根据主计划和采购合同进行催货。
According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.
根据生产运行计划,掌握生产进度,平衡调度人力、并达到出产需求。
The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.
建立了热轧无缝钢管主生产计划问题的混合整数线性规划模型。
The master problem of the model corresponds to the basic scheduling strategy and the sub problem corresponds to on-line adjusting method.
策略由基本调度策略和在线调整两部分组成,分别与模型的主问题和子问题相对应。
The master plate is responsible for the business card of modular scheduling, interface manager, and the master plate itself will usually provide several network access interface.
主控板负责各模块化板卡的业务调度、接口管理,且主控板一般本身会提供几种网络接入接口。
First, aiming at the distribution of NCS, specially the multi-master system such as CAN, there is no unified network clock, so the scheduling and management are affected.
首先针对网络控制系统分布式的特点,特别是类似于CAN总线的多主系统,由于没有单一的时钟提供同步机制,影响调度管理的同步。
On the basis of those key problems, the application of case based reasoning in resource requirements was discussed and the basic structure of the master production scheduling system was proposed.
为了快速、准确地获得最佳的主生产计划,在分析主生产计划系统中关键问题的基础上,探讨了基于事例推理技术在资源需求求解中的运用,提出了基于事例推理的主生产计划系统基本结构。
The master production scheduling is certain the production scheduling of each concrete product at each concrete time.
主生产计划是确定每一个具体产品在每一个具体时间段的生产计划。
The master production scheduling is certain the production scheduling of each concrete product at each concrete time.
主生产计划是确定每一个具体产品在每一个具体时间段的生产计划。
应用推荐