• According to the production operation plan, master production schedule, balanced scheduling of manpower and production needs.

    根据生产运行计划掌握生产进度平衡调度人力、并达到出产需求

    youdao

  • The 2011 master plan recommendations do not specify an implementation schedule or a funding mechanism.

    2011年总体规划建议没有明确实施时间表筹资机制

    youdao

  • Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.

    同时采取及时有效的纠偏措施运用多种方法措施控制了进度,确保项目总体计划进行按期实现项目投产

    youdao

  • Using a variety of methods and measures to control the programs to ensure that the project carried out by the master plan and project operation can be realized on schedule.

    同时采取及时有效的纠偏措施运用多种方法措施控制了进度,确保项目总体计划进行按期实现项目投产

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定