• The make-up tong is placed on the top tool joint and the break-out tong is placed on the bottom tool joint.

    外钳打上边的接头上,钳打在下边的接头上。

    youdao

  • Install the make-up line (s) and snub line to the rig tongs. The snub line should be at least twice the size of the tong line.

    上大锚头绳,钳尾绳外径至少大钳锚头绳两倍

    youdao

  • Install the make-up line (s) and snub line to the rig tongs. The snub line should be at least twice the size of the tong line.

    上大锚头绳,钳尾绳外径至少大钳锚头绳两倍

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定