Obtain structure of national bldg. company to decorate adornment project major to contract 2 class aptitude.
获国家建筑业企业建筑装修装饰工程专业承包二级资质。
Figure 2-6 shows key project-related characteristics of the major types of organizational structures.
图2 - 6为与项目有关的主要组织结构类型的关键特征。
Major measures for cost saving include human resource reduction, project outsourcing, automation, production work flow optimization and quality control. 2 tabs. 8 refs.
节约成本的主要方法有:减少人力成本,项目外包,自动化,优化生产流程,强化质量管理。表2。参考文献8。
The project arises from the analysis of 2 major premises, the program, needs, average cost and client requests, and secondly the geographical context, location, climate, and terrain.
这个项目起源于两大前提的综合分析,一是计划、需求、平均成本和客户的要求,二是地理环境、位置、气候和地形。
The project arises from the analysis of 2 major premises, the program, needs, average cost and client requests, and secondly the geographical context, location, climate, and terrain.
这个项目起源于两大前提的综合分析,一是计划、需求、平均成本和客户的要求,二是地理环境、位置、气候和地形。
应用推荐