• Obtain structure of national bldg. company to decorate adornment project major to contract 2 class aptitude.

    国家建筑业企业建筑装修装饰工程专业承包二级资质。

    youdao

  • Figure 2-6 shows key project-related characteristics of the major types of organizational structures.

    2 - 6为与项目有关主要组织结构类型关键特征

    youdao

  • Major measures for cost saving include human resource reduction, project outsourcing, automation, production work flow optimization and quality control. 2 tabs. 8 refs.

    节约成本主要方法有:减少人力成本,项目外包自动化优化生产流程,强化质量管理。表2参考文献8

    youdao

  • The project arises from the analysis of 2 major premises, the program, needs, average cost and client requests, and secondly the geographical context, location, climate, and terrain.

    这个项目起源于大前提综合分析计划需求平均成本客户要求地理环境位置气候地形

    youdao

  • The project arises from the analysis of 2 major premises, the program, needs, average cost and client requests, and secondly the geographical context, location, climate, and terrain.

    这个项目起源于大前提综合分析计划需求平均成本客户要求地理环境位置气候地形

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定