• The technical difficulty in flood discharging energy dissipation of the Xiaowan arch dam body leads the world and its plunge pool optimization design is also a major difficult problem of the project.

    小湾拱坝坝身泄洪技术难度已达世界当前最高水平,水垫优化设计工程中的难题

    youdao

  • The technical difficulty in flood discharging energy dissipation of the Xiaowan arch dam body leads the world and its plunge pool optimization design is also a major difficult problem of the project.

    小湾拱坝坝身泄洪技术难度已达世界当前最高水平,水垫优化设计工程中的难题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定