This paper takes three control targets in major water conservancy construction management as the objects of study and optimization a mathematical model is established.
本文以水利工程施工管理中的三大控制目标为研究对象,以三者的优化为目标,建立了数学模型。
Single chip computer control systems and industrial production of objects by the two major components.
单片机控制系统由微机和工业生产对象两大部分组成。
Single chip computer control systems and industrial production of objects by the two major components.
单片机控制系统由微机和工业生产对象两大部分组成。
应用推荐