The key water conservancy project is in Yili district. The main problem of this project is the stability of shear strength between the weak structural surface of the base and fault of the dam.
某水利枢纽工程位于伊犁地区,影响工程的主要问题为坝基岩体软弱结构面和断层的抗滑稳定问题。
The key water conservancy project is in Yili district. The main problem of this project is the stability of shear strength between the weak structural surface of the base and fault of the dam.
某水利枢纽工程位于伊犁地区,影响工程的主要问题为坝基岩体软弱结构面和断层的抗滑稳定问题。
应用推荐