• By analyzing the relation of several main variables, a simple, fast deterministic initial algorithm was proposed.

    通过分析各主要变量之间的关系,构造了一种简单、快速的确定性初始算法。

    youdao

  • This paper introduces the bridge analysis theory at length, and explains the design principle, flow chart, main variables in BSAP program in details.

    本文详细论述了BSAP程序的计算理论,对BSAP程序的设计原理、程序流程框图及程序中的主要变量进行了细致的说明。

    youdao

  • Among given variables describing a BF system, the main variables influencing the selected target function were found out according to the minimum residual path coefficient of path analysis.

    利用通径分析中的最小剩余通径系数,在给定描述高炉系统的诸多变量中,确定影响目标函数的主要变量因素。

    youdao

  • Then set the main variables and their types, and draw the flow chart of every subsystem respectively, build dynamic equations and set model parameters.

    随后确定系统中的主要变量及其种类,再分别绘制各个子系统动态学流图,建立动态学方程并确定模型参数。

    youdao

  • Under this premise, the starting point was to take as main variables the sunlight, the prevailing winds, the topography and the common program: the pool and the terrace.

    在这个前提下,出发点放在几个主要变量的考虑上——自然光线、主导方向、地形和共用设施:游泳池和露台。

    youdao

  • Under this premise, the starting point was to take as main variables the sunlight, the prevailing winds, the topography and the common program: the pool and the terrace.

    在这个前提下,出发点放在几个主要变量的考虑上——自然光线、主导方向、地形和共用设施:游泳池和露台。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定