From rock strength, the main seam roof is divided into extra-high intensity, high intensity, middle intensity, and low intensity.
从岩石强度方面把煤层顶板分成强度特高型、强度高型、强度中等和强度低型。
Seam also USES Hibernate annotations for data validation, so you must include that extension jar in addition to the main Hibernate jar.
Seam还使用Hibernate注释用于数据验证,所以除了主hibernatejar之外,还必须包括那个扩展jar。
Cavern development is the main controlling factor of high productivity and large reserves amount, while fracture development improves connectivity of seam cavern system.
溶洞发育是较高产能和较大储量规模的主控因素,而裂缝发育扩大了缝洞系统的连通性。
The main contents of the water prospection and dewatering design is presented. The mining method for down? Coal? Seam is discussed. Some safety measures are put forward.
介绍了积水区探放水设计的主要内容,讨论了下煤层开采的基本方法,提出了几点重要的安全措施。
Burn through is the main problem of longitudinal seam welding of ultra-thin tube with small diameter. Assembly of the joint and welding technology are the key to solve the problem.
小直径超薄壁管纵缝焊接的主要问题是烧穿,解决这个问题的关键是严格控制焊接接头的装配质量及焊接工艺。
The structure and dimension of welding pin are the main factors which affects the flow direction of the plastic metal in FSW zone and the quality of the FSW seam.
焊接过程中搅拌焊针的结构形状是影响焊缝区塑性软化材料流动方式的主要因素,从而影响焊缝的成型质量。
The gas pressure is a main factor of deciding gas content in coal seam. It is an important parameter of the dangerous prediction for coal and gas outburst too.
煤层瓦斯压力是决定煤层瓦斯含量的一个主要因素,也是煤与瓦斯突出危险性预测的一个重要参数。
Through the analysis of practical data, the main factors influenced on the water gushing of seam floor are studied.
通过对实际资料分析,研究了影响煤层底板突水的主要因素。
The Main Chromitite Seam and the Merensky Reef do not outcrop well.
主铬铁岩矿层及麦仑斯基矿层出露不好。
Being influenced by the dual factor of the coal seam gas pressure difference and ventilation, the coal seam is the main route at the later period of the gas release.
受煤层瓦斯压力差和煤层的透气性双重因素影响,煤层是瓦斯后期释放的主要通道。
Main products are series bolts, series anchor cables, pipe seam roof anchor series and all kinds of steel, W strips, trays, machinery installation and so on.
主导产品是新型锚杆系列、锚索系列、管缝式锚杆系列及各种顶板钢带、W钢带、托盘、和安装机具等。
Main geologic factors that influence recoverability of coal-seam gas include coal-bed permeability, reservoir pressure, gas saturation and desorption rate.
影响煤层气可采性的主要地质因素有:煤层的渗透性、储层压力、含气饱和度、解吸率等。
By field observation and simulating test of shallow seam longwall mining, the phenomenon of main roof asymmetry breaking is discovered during the first weighting.
依据典型浅埋煤层工作面的实测和模拟,发现了采场老顶初次破断的非对称现象。
The unit forecast method is applied to forecast quantitatively the complicated degree of small structure in main coal seam.
用单元预测法对研究区主采煤层小构造的复杂程度进行了定量预测。
At last, the fatigue crack in the experiment and the main influential factor of fatigue strength of fillet welding seam was studied.
最后,对疲劳试验中有关裂纹以及影响焊缝疲劳强度的主要原因进行了探讨。
It puts forward welded seam automatic tracking system based on DSP vision sensor and presents the system main hardware block and software design briefly.
提出一种基于DSP(数字信号处理器)的视觉传感器焊缝自动跟踪系统,并对系统主要硬件模块及软件设计做了简要介绍。
According to the problem that the welding seam of the main winch drum structure is easy to crack, this article analyzes the cause and puts forward efficient measures of reducing it's ouurrence.
根据主井绞车滚筒结构的开焊情况,分析了开焊的因素,提出了减少开焊的措施。
Welding seam should be numbered according to pipeline medium set, in principle, main pipe prior to branch pipe.
焊缝编号应根据管线介质流向进行编号,原则上应先主管后支管。
The paper briefly analyses the main cause of crack of welding seam on an evaporation tank and proposes the precautionary measures for preventing such kind of accident on pressure vessels.
简要分析了一台蒸发罐发生焊缝开裂的主要原因,提出防止此类压力容器事故的预防措施。
The main technology to realize high production and high efficiency in abroad is fully mechanized long-wall mining for a single seam or room-and-pillar mining.
国外高产高效矿井建设是以单一煤层长壁和房柱式综合机械化为主要开采技术。
There are many kinds of forms of gas discharge, but the main form is soft coal seam gas discharge.
瓦斯抽放形式有多种,本煤层抽放是其主要形式。
The seam thickness change is one of the main factors effected on coal mining.
煤层厚度变化是影响煤矿开采的主要因素之一。
First, based on similar material model test, top coal cave-in characters in steep and thick seam were studied as well as failure law of main roof and features of surface subsiding.
首先利用相似模拟实验研究了急斜特厚煤层顶煤的冒落特征、顶板的破坏规律,以及地表下沉的特点。
The main factor causing destruction of roadway in tectonic stress field is found to be the high tensile strain, which appears after the coal seam above haulage roadway is mined.
提出在构造应力场中,开采运输巷道上方的煤体使巷道产生拉伸形变是巷道破坏的主要根源。
"Mining above aquifer", as the main method to explore coal seams above confined aquifer, in which the determination of coal seam floor failure depth is the key factor and precondition.
带压开采是承压水上采煤的主要方法,底板采动破坏深度的确定是实现带压开采的关键和前提。
The paper described the development plan, the selection of seam location and the arrangement methods of main roadway in Jinchang Coal Mine from the designing aspect under present geological condition.
在现有矿井地质条件下,从设计方面论述了晋昶煤矿的开拓方案、选择大巷层位及设计大巷布置方式。
The main target coal seam of Xieqiao Mine is directly covered with the Quaternary bottom gravels, whose impermeability affects the reasonable retainment of waterproof pillar.
第四纪底砾层直接覆盖在谢桥煤矿煤系地层之上,其隔水性能影响到防水煤柱的合理留设。
This text mainly introduces the main problem existing in the thick coal seam layering mining and the method to solve it.
本文介绍厚煤层分层开采存在主要问题和解决方法。
We are one of the manufactory specialized in furniture accessory. Our main products are hot melt adhesive, edge banding, glue, school glue, water tape and flat-fell seam.
我司是一家专业于家具辅料的厂商,我们的主要产品有热熔胶、封边条、木工胶水、小瓶胶、水胶纸和拼缝线等。
The seam thickness change is one of the main factors effected on coal mining.
构造作用是控制井田范围内煤层厚度变化的主要地质因素。
应用推荐