• The main engineering geological problems of the gully are slope stability, seepage stability and fluvial erosion, etc.

    该沟主要工程地质问题为边坡稳定性、渗透稳定性、河流侵蚀等。

    youdao

  • The main engineering geological problems are as follows:soft soil, powder soil, welled soil (rock) , landslip, breakdown talus and broken weak rock mass.

    主要的工程地质问题有:软土、粉土、膨胀土(岩)、滑坡、崩塌岩堆、岩溶、破碎软弱岩体等。

    youdao

  • The foundation digging, reinforcement and seepage control of the building are designed according to the main engineering geological problems in the foundation of the project.

    根据枢纽建筑物基础存在的主要工程地质问题,对建筑物基础开挖、加固、以及渗控工程进行设计。

    youdao

  • Based on collecting the data of the engineering geological exploration, this paper comments on the quality and main engineering geological problems of the subsidiary dam of Shencun Reservoir.

    在收集工程地质勘察资料的基础上,对该申村水库副坝坝体质量及副坝段主要工程地质问题进行了评析。

    youdao

  • Based on collecting the data of the engineering geological exploration, this paper comments on the quality and main engineering geological problems of the subsidiary dam of Shencun Reservoir.

    在收集工程地质勘察资料的基础上,对该申村水库副坝坝体质量及副坝段主要工程地质问题进行了评析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定