In this paper, the working procedure Confirmation of Control Variable and Selection of Main Components and Part of Design Schematic of tread cutting system are expressed in detail.
详细介绍了胎面裁断系统的工作过程以及控制变量的确定、主要元件的选取和部分控制回路的设计图。
This paper analyzes the current situation of inspection and control for construction project, and puts forward the target, procedure and main job of safe inspection and control.
摘要文章分析了建设工程安全监理的现状,提出了安全监理的目标、程序和主要工作。
The paper introduces construction procedure and quality control methods of the bridge, also discusses observation results of main arch ring during construction and completion of work.
文中介绍了该桥的施工过程和关键工序的质量控制方法,以及在施工过程中和竣工后对主拱圈的观测测量结果。
Control plan, procedure flowchart and part of main procedure are introduced.
介绍了控制方案和程序流程图及部分主程序。
Main content including control system plan designs, PLC control procedure design.
主要内容包括控制系统的方案设计、PLC控制程序设计。
The main strategy should include in itself the use of three-dimensional flow theory, improvement of vanes stacking skill, control of hydraulic losses, and use of CFD in vane design procedure.
采用三维流动理论,改变叶片造型方法,控制水力损失和引入CFD方法是提升现有轴流泵叶片设计的主要策略。
The main topic discussed in this paper is quality assurance procedure of UHT milk production as well as the relationship and difference versus quality control system.
重点介绍了超高温奶生产过程中的质量保证系统以及它与质量控制系统间的关系和区别。
The principles underlying the control and hardware topology as well as a block diagram for the main procedure are alsop…
文中还叙述了系统的控制原理及硬件组成,且给出了主要的程序框图。
The management system set up in the article include two main part, that is procedure control system and environmental control system.
本文建立的信贷风险管理系统包括两大部分,即信贷风险环境控制体系和信贷风险过程控制体系。
The system USES TMS320LF2407 as major control chip, introduces system main scheme design, hardware design, software design, and gives detail experimental procedure and analysis of experimental data.
文章提出采用TMS320 LF 2407为主控芯片,介绍了系统总体方案设计、硬件设计、软件设计、并给出了详细的实验步骤和实验数据分析。
The procedure of determining the main hydrodynamic control para-rneters are illustrated in detail.
也阐述了确定装置主要流体力学控制参数的方法。
Combining the engineering practice, this paper introduces the procedure, main points of control and treatment of quality problems for construction supervision of bored cast-in-situ piles.
本文结合工程实践,介绍钻孔灌注桩施工监理程序、控制要点及质量问题处理。
The paper introduces the procedure of development of the DVT prevention apparatus taken the AT89C51 as the main control unit.
研制了以AT89C51单片机为主控单元的深静脉血栓预防仪。
The paper introduces the procedure of development of the DVT prevention apparatus taken the AT89C51 as the main control unit.
研制了以AT89C51单片机为主控单元的深静脉血栓预防仪。
应用推荐