The lower chord of a vierendeel truss, when loaded, is subjected to the combined action of prestressed compression, large axial tension, moment and shear.
空腹屋架下弦处于预压力、强大的轴拉力、弯矩和剪力共同作用下工作。
The ceiling system should satisfy these requirements that using lower chord ball as fixed point, adapting space change of hyperboloid steel grid, grid settlement under snow load.
其天花体系要满足以屋面网架下弦球为固定点和适应双曲面的空间变化、网架雪荷载作用下沉、热胀冷缩等变形运动。
End face with a gap, no boss butt is refers to the upper and lower casing left a certain gap between the upper and lower main chord rod end face at the same time contact.
端面有间隙、无凸台对接是指在上、下套管之间留有一定间隙,上、下主弦杆端面同时接触对接。
End face with a gap, no boss butt is refers to the upper and lower casing left a certain gap between the upper and lower main chord rod end face at the same time contact.
端面有间隙、带凸台对接外形是指在标准节上部主弦杆上焊有定位凸台,定位凸台伸人另一标准节主弦杆内,上、下套管之间留有一定间隙配合定位。
End face with a gap, no boss butt is refers to the upper and lower casing left a certain gap between the upper and lower main chord rod end face at the same time contact.
端面有间隙、带凸台对接外形是指在标准节上部主弦杆上焊有定位凸台,定位凸台伸人另一标准节主弦杆内,上、下套管之间留有一定间隙配合定位。
应用推荐