• The drilling of lower channel sand bodies along the ridge of the nose-shaped uplift is successful, making Ge 7 to Hongtai 2 a continuous oil/gas-bearing area.

    沿鼻隆脊部钻探低部位河道砂体获得成功,实现了疙7-红台2号含油气区的复合连片。

    youdao

  • The smooth acceleration sheet is arranged at the bottom in the conveying pipeline to temporarily divide a conveying channel into an upper channel and a lower channel.

    平滑加速片设置在输送管道内的底部,将输送通道暂时分割为上部通道和下部通道。

    youdao

  • The smooth acceleration sheet is arranged at the bottom in the conveying pipeline to temporarily divide a conveying channel into an upper channel and a lower channel.

    平滑加速片设置在输送管道内的底部,将输送通道暂时分割为上部通道和下部通道。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定