• To settle loose bed, quick sand and ingress of groundwater are trouble some problems during coalmine construction.

    如何解决煤矿建井中的松散层、流沙和地下渗(涌)水是目前建井工程中的棘手问题。

    youdao

  • The reducing in water production of tube well is a familiar problem, especially in the loose bed of the quaternary system.

    管井出水量减少是常见的问题,特别是第四系松散层中的管井更为普遍。

    youdao

  • Moreover, there are some other influencing factors such as: thick loose bed, surface mining degree, impel speed of working face, coal mining and roof manage methods, mining procedure and time.

    此外,厚松散层、地表采动程度、工作面推进速度、采煤方法与顶板管理方法、开采程序及时间因素等对采场覆岩空间结构均有一定影响。

    youdao

  • Moreover, there are some other influencing factors such as: thick loose bed, surface mining degree, impel speed of working face, coal mining and roof manage methods, mining procedure and time.

    此外,厚松散层、地表采动程度、工作面推进速度、采煤方法与顶板管理方法、开采程序及时间因素等对采场覆岩空间结构均有一定影响。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定