• It provides important reference for Longtan high RCC dam design and construction.

    为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。

    youdao

  • The tailrace impedance surge chamber is going to be used on Longtan hydropower station.

    龙滩水电站设置尾水阻抗式调压井。

    youdao

  • The RCC dam of Longtan project is one of the highest dam in the world under construction.

    龙滩水电站大坝为目前世界上在建的最高碾压混凝土坝。

    youdao

  • Longtan hydro-engineering complex consists of hydro-power station, release sluice, the ship lock.

    龙潭水电站枢纽由船闸、电站、泄洪闸组成。

    youdao

  • Reports say that the accident happened at the two-year-old Longtan mine in Xiaojing Township Tuesday night.

    据报导,星期二夜间,小井乡开工两年的龙滩煤矿发生透水事故。

    youdao

  • The excavation of the left-bank diversion tunnel of Longtan Hydropower Project adopts the excavation by layer.

    龙滩水电站左岸导流洞开挖采用分层开挖法。

    youdao

  • Siderite is vastly developed in the Longtan, Changxing formations in southwestern mine area, Zhijin coalfield.

    织金煤田西南矿区龙潭组、长兴组广泛发育菱铁矿层。

    youdao

  • The fact that Changxing limestone thin out from east to west makes Yinkeng group contact directly Longtan group.

    长兴灰岩由东向西变薄尖灭,致使殷坑组与龙潭组直接接触。

    youdao

  • Blasting vibration observation result of the right bank's high slope of Longtan Hydropower Project is introduced.

    介绍了龙滩水电工程右岸高边坡开挖中的爆破振动观测成果。

    youdao

  • Through the application in the creep mass—B section of Longtan hydropower station, the reliability is proved to be successful.

    经在广西龙滩水电站蠕变体B区应用,其可靠性都得到了很好验证。

    youdao

  • The numerical result of water temperature of reservoir in Longtan engineering by use of finite element method (FEM) is reliable and accurate.

    通过对龙滩工程水库水温的计算结果表明,用有限元法计算水库水温有较高的精度和可靠性。

    youdao

  • The Shuiyindong gold deposit, which occurs in the Longtan Formation of the Upper Permian series, is a super-large, high-grade gold ore deposit.

    黔西南水银洞金矿为产于上二叠统龙潭组中的超大型、高品位金矿床,矿床由多个金矿体组成。

    youdao

  • Finally, combined with productive tasks, some Suggestions are provided for the optimum design and safe operation for Longtan bottom radial gate.

    同时,结合生产任务,为龙滩底孔弧形闸门的优化设计和安全运行提供参考意见。

    youdao

  • In the initial impoundment of Longtan Reservoir, it has certain influences to the downstream water supply since there is no runoff below the dam.

    龙滩水库在下闸蓄水开始阶段,坝下断流,对下游供水有一定的影响。

    youdao

  • The above mentioned application and studies are integrated with Longtan underground powerhouse project. The thesis has specific project background.

    本文的应用与研究都基于龙滩地下引水发电工程,有明确的工程实践背景。

    youdao

  • The three dimensional FEM(Finite Element Method) and the submodeling technique are used to analyze the water intake of the Longtan hydropower station.

    采用空间有限元以及子结构方法对龙滩水电站导流隧洞进水口结构配筋设计方案进行复核与评价。

    youdao

  • After a field research of those elements in Longtan Village, the paper then makes an analysis combining the model of community integration in tourism.

    在研究上述因素在龙潭村的表现的基础上,本文结合旅游社区整合模型进行分析。

    youdao

  • Relating with the sedimentary environments, uranium mineralization is primarily occurred in the lower-middle Triassic and the base of Longtan Formation.

    铀矿化主要赋存于下—中三叠系及龙潭组底部,和沉积环境有一定关系。

    youdao

  • Permian Longtan Formation coal-bearing measures under detachment structure and Cretaceous red-bed was newly discovered in Matouling well field, Hunan province.

    在马头岭井田新发现一个滑覆构造和白垩系红层掩盖下的二叠系上统龙潭组含煤构造。

    youdao

  • The machine designed, which was tested successfully in the RCC construction of Three Gorges Project, will be utilized widely in the RCC construction of Longtan.

    设计制造的样机在三峡工程的碾压混凝土施工中试验,取得了很好效果,即将在龙滩工程碾压混凝土施工中推广应用。

    youdao

  • A Permian Longtan Formation coal-bearing measures under detachment structure and Cretaceous red-bed was newly discovered in Matouling well field, Hunan province.

    在马头岭井田新发现一个滑覆构造和白垩系红层掩盖下的二叠系上统龙潭组含煤构造。

    youdao

  • Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.

    研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。

    youdao

  • In this paper, the expert system and computer simulation techniques are introduced to study the transportation alternatives of RCC at Longtan hydropower station.

    引入专家系统和采用计算机模拟技术研究龙滩水电站大坝碾压混凝土的运输方案。

    youdao

  • The Upper Permian System Longtan coal measure in the Changguang coal deposit is a complete sedimentary cycle, consisting of a regressive and a transgressive series.

    长广煤田上二迭统龙潭含煤岩系是由海退系列和海进系列组成的一个完整沉积旋回。

    youdao

  • How to solve the problems of the safety and stability of the surrounding rock is a difficult point for the design and construction of Longtan Underground Power House.

    如何解决好围岩的安全稳定是龙滩地下厂房设计和施工的难点问题。

    youdao

  • It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.

    龙滩水电站工程通过利用工程弃渣和统一调配使用场地,实现了狭窄坝区的施工总布置。

    youdao

  • The safe and high-efficient service of Nandan material transfer station plays an important role to ensure material supply for the construction of Longtan Hydropower Project.

    南丹物资转运站的安全、高效运转是确保龙滩工程建设物资材料保障供应的关键环节。

    youdao

  • The paper set forth the important strategic significance of Longtan Hydropower Station located on the Hongshui River in power generation, flood control and navigation benefits.

    阐述了龙滩水电站在发电、防洪和航运等方面的重要战略意义。

    youdao

  • The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.

    地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。

    youdao

  • The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.

    地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。