• The blackstart power source planning model based on minimization of social interruption cost is proposed to optimize the capacity and location of the blackstart unit.

    建立了社会停电损失最小为目标启动电源规划模型,用以优化黑启动电源的安装位置容量

    youdao

  • The location selection is a key ring in the logistical planning that would give the model construction and shape in the whole system.

    设施选址物流规划中的一个重要环节,它决定整个物流系统的模式结构形状

    youdao

  • The location selection is a key ring in the logistical planning that would give the model construction and shape in the whole system.

    设施选址物流规划中的一个重要环节,它决定整个物流系统的模式结构形状

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定