The control programme was decided, and loading capacity was controlled by fuzzy PID. The control system can adapt to different ore.
确定了磨矿分级控制方案,对给矿量进行模糊PID控制,使系统对不同的原矿均能有良好的适应。
Logistics, freight, transport, shipping, distribution, return trip vehicle - vehicle - 0 - loading, handling, moving, information processing, logistics programme design planning.
物流、货运、运输、托运、配送、回程车-整车-零担-配载、装卸、搬家、信息处理、物流方案设计策划。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
应用推荐