• Open-pit mining follows the same sequence of oprations as underground mining: drilling, blasting, and loading and removing waste and ore.

    露天采矿遵循地下采矿相同作业顺序钻孔爆破装载运走废料矿石

    youdao

  • Open-pit mining follows the same sequence of operations as underground mining: drilling, blasting, and loading and removing waste and ore.

    露天采矿遵循地下采矿相同作业顺序钻孔爆破装载运走废料矿石

    youdao

  • Stoppage of loading due to break down of the ore loading plant shall be counted as lay-time.

    如果装载设备工作中断而导致装运的停滞,由此产生时间损失应该视为延迟装运时间(停工时间)。

    youdao

  • The paralled loading the lay of coal and ore are better than perpendicular.

    分层水平料方式优于垂直装料。

    youdao

  • The control programme was decided, and loading capacity was controlled by fuzzy PID. The control system can adapt to different ore.

    确定了磨分级控制方案给矿进行模糊PID控制,使系统不同的原矿均有良好的适应

    youdao

  • The control programme was decided, and loading capacity was controlled by fuzzy PID. The control system can adapt to different ore.

    确定了磨分级控制方案给矿进行模糊PID控制,使系统不同的原矿均有良好的适应

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定