For peak load unit, its process model and structure parameters have obviously fast time-varying characteristic while load changing.
对于调峰机组,当负荷变化时机组的过程模型甚至结构参数都具有明显的快时变特性。
The capacity of peak load unit directly affects peak electricity price level and reliability of power supply during peak load period.
峰荷机组装机容量的确定直接影响到峰荷时段的电价尖峰水平和供电可靠性等问题。
The concepts of load, unit load and loading factor are introduced.
介绍机械密封常用的密封面载荷、比载荷和载荷系数。
The concepts of load, unit load and loading factor are introduced.
介绍机械密封常用的密封面载荷、比载荷和载荷系数。
应用推荐