• Start the test to load the selected input dataset.

    开始测试加载选中输入数据集

    youdao

  • Load keeps track of the start and end time, and it informs you when the test has completed.

    LotusServer .Load记录开始时间结束时间测试结束通知

    youdao

  • That is, start with the default WebSphere Application Server settings and then let the load test guide you in terms of which other extensions might need to be implemented.

    就是说开始时采用缺省WebSphereApplicationServer设置然后负载测试指导可能需要实现其他哪些扩展

    youdao

  • When you start a load test, it allocates a range of available ports for each Network profile that you have selected in your network mix , for example, DSL and 56.

    启动负载测试时,会针对您在网路混合选取每个网路设定档例如DSL 56。

    youdao

  • This article introduces several types of the start-up equipment for gas turbine, expatiates the start-up equipment and the start-up process for M701F gas turbine no load test.

    阐述燃气轮机启动装置几种形式,对M701 F燃机空负荷试车的启动装置进行了详细介绍,同时也介绍了燃机启动的过程

    youdao

  • Start the load test of auxiliary engine.

    开始负载试验

    youdao

  • Start the load test of auxiliary engine.

    开始负载试验

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定