Failover is the planned or unplanned shutdown of the primary system and includes the accompanying task of bringing a standby node online to take over the processing load.
故障转移是主系统在计划内或计划外的关闭,并包括完成将备用节点置于在线以接管处理负载的任务。
UPS in a very short time into the "German sunshine low storage battery voltage automatic shutdown" working condition, so as to stop supply power to the load.
UPS在极短时间内进入“德国阳光蓄电池电压过低自动关机”的工作状态,从而停止向负载供电。
If the boiler and a water pipeline corrosion problem, the system may happen down the load and shutdown.
如果锅炉和输水管道出现了腐蚀问题,系统可能发生降负荷和停机。
The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.
在汽机DEH系统适应快速降负荷的情况后,根据汽机主设备要求的时间短暂带厂用电负荷运行进行滑压停机。
Antifreezing is always a notable problem in the start-up in winter, shutdown process and low load operation period of air cooling condenser of large size direct air cooling unit.
大型直接空冷机组空冷凝汽器在冬季启动、停机过程以及低负荷运行阶段的防冻问题尤为突出。
Exceptional load cases are those corresponding to events of very low occurrence probability requiring the safe shutdown and inspection of the vessel or plant.
异常负荷案例是相对很少发生的事件,要求安全关停和容器设备的检查。
Internal circuit protection includes short-to-ground, shorted load, thermal shutdown with hysteresis, and crossover current protection.
内部电路保护包括短至地面,负载短路,滞后热关机,和交叉电流保护。
Detects tool wear (high load) or breakage (low load) in machine tools and shutdown or signals maintenance for added safety.
检测机械工具的工具磨损(大负荷)和破损(小负荷)、停机或信号维护,以增加安全性。
IPS automatically shutdown if overload exceeds 120% of normal value for 10 seconds, IPS automatically resume work if overload comes to rated load.
当负载超过120%时,10秒后,IPS自动关闭输出;当负载恢复到额定负载后,IPS自动恢复正常工作。
The fuel and load vary more often, start-up and shutdown times of boiler increase, average load decreases and boilers operate at low load frequently.
火电厂中由于燃煤品质多变,低负荷运行时间不断积累和反复启停,使锅炉受热面积灰日益严重。
The instrumented shutdown analysis forms the basis for the Fujian Ethylene Plant loads except for the maximum safety valve load on each flare header, where the non-instrumented basis is applied.
好像是说对于火炬总管上负荷是基于最大安全阀的负荷来决定的,这是个运用非仪表基准的例外情况。
By monitoring both voltage and power, the unit measures the normal working load, then calculates and sets an automatic shutdown point for detected power changes.
通过监测动力电压,该装置先对正常的工作量进行测定,然后依据被测动力发生的变化,估计并设定一个自动的关闭点。
By monitoring both voltage and power, the unit measures the normal working load, then calculates and sets an automatic shutdown point for detected power changes.
通过监测动力电压,该装置先对正常的工作量进行测定,然后依据被测动力发生的变化,估计并设定一个自动的关闭点。
应用推荐