• Failover is the planned or unplanned shutdown of the primary system and includes the accompanying task of bringing a standby node online to take over the processing load.

    故障转移系统计划内计划外关闭包括完成备用节点置于在线接管处理负载的任务

    youdao

  • UPS in a very short time into the "German sunshine low storage battery voltage automatic shutdown" working condition, so as to stop supply power to the load.

    UPS时间内进入德国阳光蓄电池电压过低自动关机”的工作状态从而停止负载供电

    youdao

  • If the boiler and a water pipeline corrosion problem, the system may happen down the load and shutdown.

    如果锅炉输水管道出现了腐蚀问题系统可能发生负荷和停机。

    youdao

  • The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.

    汽机DEH系统适应快速负荷情况根据汽机设备要求时间短暂带厂用电负荷运行进行停机。

    youdao

  • Antifreezing is always a notable problem in the start-up in winter, shutdown process and low load operation period of air cooling condenser of large size direct air cooling unit.

    大型直接机组空冷凝汽器冬季启动停机过程以及负荷运行阶段防冻问题尤为突出。

    youdao

  • Exceptional load cases are those corresponding to events of very low occurrence probability requiring the safe shutdown and inspection of the vessel or plant.

    异常负荷案例相对很少发生事件要求安全关停容器设备检查

    youdao

  • Internal circuit protection includes short-to-ground, shorted load, thermal shutdown with hysteresis, and crossover current protection.

    内部电路保护包括短至地面,负载短路滞后关机交叉电流保护。

    youdao

  • Detects tool wear (high load) or breakage (low load) in machine tools and shutdown or signals maintenance for added safety.

    检测机械工具工具磨损(负荷)破损(负荷)、停机信号维护增加安全性

    youdao

  • IPS automatically shutdown if overload exceeds 120% of normal value for 10 seconds, IPS automatically resume work if overload comes to rated load.

    负载超过120%时,10秒后IPS自动关闭输出;当负载恢复额定负载后,IPS自动恢复正常工作

    youdao

  • The fuel and load vary more often, start-up and shutdown times of boiler increase, average load decreases and boilers operate at low load frequently.

    火电厂中由于燃煤品质多变,负荷运行时间不断积累反复启,使锅炉受热面积灰日益严重。

    youdao

  • The instrumented shutdown analysis forms the basis for the Fujian Ethylene Plant loads except for the maximum safety valve load on each flare header, where the non-instrumented basis is applied.

    好像是说对于火炬总管负荷基于最大安全阀负荷来决定的,是个运用仪表基准例外情况。

    youdao

  • By monitoring both voltage and power, the unit measures the normal working load, then calculates and sets an automatic shutdown point for detected power changes.

    通过监测动力电压装置正常工作量进行测定,然后依据被测动力发生的变化估计设定一个自动关闭

    youdao

  • By monitoring both voltage and power, the unit measures the normal working load, then calculates and sets an automatic shutdown point for detected power changes.

    通过监测动力电压装置正常工作量进行测定,然后依据被测动力发生的变化估计设定一个自动关闭

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定