• How did the user load change over 24 hours in a specified day?

    在某天24小时内用户负载的变化情况如何?

    youdao

  • The practice proved that judging blasting effect by means of the load change on props is an easy and applicable surveying and analysis method.

    实践证明,利用支柱载荷变化判断爆破效果是一种简单实用的测试和分析方法。

    youdao

  • Automobile ride varies with the speed, road conditions and load change.

    平顺性会随着车速、路面及载荷不同发生很大的变化。

    youdao

  • According to the heat equilibrium of indoor room air and one of the surface of interior protective structures, load change can be dynamically analyzed.

    根据室内空气热平衡和围护结构内表面的热平衡,可以对负荷变化进行动态分析。

    youdao

  • A trapezoid fuzzy figure is adopted to estimate the load change of distribution transformer and the single-phase distribution network model is constructed.

    采用梯形模糊数估计配变负荷变化情况,建立了单相线路网络模型。

    youdao

  • This defect seriously affects the tuning of temperature controller and causes bad temperature control results when the load change command varies very often.

    这一缺点严重影响到温度调节器的整定,当负荷变化指令变动频繁时温度控制效果也不会好。

    youdao

  • The meaning of automatic load change control system used in oxygen making process is introduced according to relationship between steelmaking and oxygen making.

    从转炉生产与氧气生产的关系, 说明采用制氧生产自动变负荷控制的意义, 并阐述自动变负荷系统的原理,控制参数和调节周期。

    youdao

  • And the load change under continuous days of high temperature is obviously different from what under normal high temperature due to the cumulative effect of heat.

    由于温度具有热累积效应,持续高温日负荷的变化规律与普通气象条件下的变化规律有明显的区别。

    youdao

  • BPneuralnetworkbased load forecasting model of natural gas is presented, and in this model all the factors that influence the natural gas load change are taken into account.

    提出了一种基于BP神经网络的天然气负荷预测模型,模型中考虑了影响负荷变化的各种因素。

    youdao

  • A BPneuralnetworkbased load forecasting model of natural gas is presented, and in this model all the factors that influence the natural gas load change are taken into account.

    提出了一种基于BP神经网络的天然气负荷预测模型,模型中考虑了影响负荷变化的各种因素。

    youdao

  • This paper mainly describes the configuration, network communication, control principle and the application of an automatic load change system used in an air separation plant.

    本文主要介绍自动变负荷系统的构成,网络通信,控制原理和应用。

    youdao

  • The original coordinated control system was modified greatly, and the "intellectual" control strategy for load change was adopted to realize quick, accurate, and stable load change.

    对原协调控制系统作了较大的修改,采用了“智能化”变负荷控制策略,使变负荷快速、准确和稳定。

    youdao

  • Concerning the issues of no real-time and not sensitive to load change, this paper proposed a new prediction algorithm based on chunk taking account of the task's characteristics in grid.

    针对当前已有预测算法不实时、对负载变化不敏感的问题,结合网格中任务的特点,提出新的基于分块的预测算法。

    youdao

  • In those coupling states, the load change command from temperature controller is by-passed, and the air and fuel flows change very slowly because of the nature of the closed coupling system.

    在那些耦合状态下,由温度调节器来的负荷变动指令被旁路,由于耦合系统闭环的性质,空气和燃料流量变化极慢。

    youdao

  • Based on the multi - scenario probability method, the uncertain factors, such as wind farm power output, load change and economy, are described by scenario analysis and probability calculation.

    应用多场景概率的方法,将风电场的输出功率和在电网规划中涉及到的负荷变化、经济等不确定性因素,以场景分析和概率计算的方式加以描述。

    youdao

  • A new method of short time load forecasting on the base of elasticity coefficient is put forward according to the characteristic of obvious fractal self similarity of load change in power system.

    针对电力系统负荷变化具有明显的分形自相似性的特点,提出了一种新的基于弹性系数的短期负荷预测方法。

    youdao

  • The lower-level problem is to maximize the loading margin under a load change direction and the upper-level problem is to find the closest critical point subject to the constraints of load change.

    下层问题求解某个负荷变化方向上的最大负载裕度,上层问题考虑负荷变化方向的约束,寻找最近的电压稳定临界点。

    youdao

  • The shortness of creep loading time and the faster frequency of fatigue load change induce general elastic strain stage to end and delayed elastic strain platform stage to begin under shorter strain.

    因蠕变加载作用时间缩短和疲劳载荷变化更频繁,导致在较小的应变下结束普弹应变阶段并进入延迟弹性变形的平台应变阶段。

    youdao

  • The shortness of creep loading time and the faster frequency of fatigue load change induce general elastic strain stage to end and delayed elastic strain platform stage to begin under shorter strain.

    因蠕变加载作用时间缩短和疲劳载荷变化更频繁,导致在较小的应变下结束普弹应变阶段并进入延迟弹性变形的平台应变阶段。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定