• Your course load is set, your grades are set, your test scores are set.

    课程负荷已经确定了,你的分数已经确定了,你的考试成绩也已经确定了。

    youdao

  • We conducted each load test twice to determine whether the same results would occur.

    我们执行每个负载测试两次确定是否发生相同结果

    youdao

  • It allows you to record the steps that you want to run load test on, and then replay the steps with the appropriate user loads.

    允许录制运行负载测试一步操作然后通过适当的用户负载重这些操作。

    youdao

  • Therefore, leave the default access intent policies until you are able to run the load test to determine whether or not there are data integrity, deadlock, or performance problems.

    因此,在能力运行负载测试确定是否数据完整性、死性能问题之前请保留缺省访问目的策略不变。

    youdao

  • If referential integrity violations are discovered during the load test, then you might also need to set the sequence grouping for container managed persistence.

    如果负载测试过程中发现存在引用完整性违规可能需要容器管理持久性设置顺序分组

    youdao

  • Notice that the load test clients are not residing on the application servers themselves.

    注意负载测试客户机没有驻留应用程序服务器上

    youdao

  • With all the tables defined in the test database, you can now load test data.

    测试数据库定义所有表之后现在可以装载测试数据

    youdao

  • The test results should show some correlation between the numbers seen on the load test client side and those on the application server.

    测试结果应该显示负载测试客户机所看到数字应用程序服务器的数字之间有某些相关性

    youdao

  • Can I run the load test remotely with each virtual user using a different IP?

    是否能够通过一位虚拟用户使用不同IP远程运行负载测试

    youdao

  • This was caused by the way in which the custom load test tool was created.

    由于定义负载测试工具创建方式所导致的。

    youdao

  • In load test, multiple users access the program concurrently to simulate the expected usage of a software program.

    负载测试中,多个用户同时访问程序模拟预期软件程序使用情况

    youdao

  • Of course, the most accurate measurements come from a load test that simulates production conditions to correctly evaluate the size of these pools.

    当然大多数准确测量来自模拟生产条件负载测试正确评估这些大小

    youdao

  • Automation of both functional and load test scripts are specified here because the cost of manually testing a multitude of applications with every change quickly becomes unaffordable.

    这里之所以强调功能负载测试脚本自动化是因为手动测试大量应用程序每个更改成本极其高昂。

    youdao

  • Time: Total time of the load test run.

    时间负载测试运行时间。

    youdao

  • Also, the load test client must be capable of generating the appropriate type of request needed for loading the application in question.

    还有负载测试客户机必须能够生成装入涉及应用程序所需正确类型请求

    youdao

  • Fixed a problem of excessive CCRPC process creation during high concurrent load test scenario.

    修复负载测试场景期间过剩CCRPC过程创建问题

    youdao

  • After making the appropriate response time breakdown configuration, you must execute the test or schedule to initiate application monitoring during the load test.

    进行合适响应时间分解配置之后,必须执行测试或者调度负载测试期间初始化应用程序监控

    youdao

  • These options are used mostly during a load test, but there are some situations where timing may be important on your functional test, and you may need to set the transaction rate.

    这些选项经常装载测试中使用,但是还有一些情况比如功能测试中时间可能重要并且可能需要设置事务速率。

    youdao

  • A project I once worked on established a good set of automated tests that could load test the application while it ran multiple transactions.

    曾经参与过的项目建立了很好的自动化测试可以应用程序进行负载测试同时还可以运行多个事务

    youdao

  • An improved load test tool was created to address these issues.

    第二个负载测试工具经过改进处理这些问题

    youdao

  • For example, load test, stress test and performance tests, where the product is tested under high load and each of these tests USES the same system resources from the system.

    例如,在负载测试压力测试性能测试中,产品较高的负载中进行测试,每种测试都使用相同系统资源

    youdao

  • Additional notes: Any additional notes regarding the specific load test run.

    其他说明有关特定负载测试运行任何其他说明。

    youdao

  • Once you get a load test running with an automated build, schedule it to run on a periodic basis, such as nightly.

    使用自动构建运行负载测试时,将其安排某个周期运行比如每晚运行一次

    youdao

  • Create a test harness and load test your database.

    创建一个测试用具,对数据库进行负载测试。

    youdao

  • Once you move into a load test environment, you will need views of your application beyond what traditional profilers provide.

    一旦已经转入一种负载测试环境需要观察应用程序,而不仅仅局限传统评测器提供的范围内。

    youdao

  • During a load test, a meaningful user that loads breakdown to multiple test clients is often desirable.

    负载测试期间,一位导致多个测试服务器负载崩溃用户往往我们所想要的。

    youdao

  • After the simple load test, the object will be tested to ensure it was instantiated properly.

    简单装入测试测试对象确保正确实例化的。

    youdao

  • A load test generator takes think time into account as it runs virtual users (more on this later) through its script.

    通过脚本运行虚拟用户(稍后详细介绍内容)的同时,负载测试生成器思考时间纳入考虑范围。

    youdao

  • Ensure that the Web server has enough listeners defined in order to avoid "failed to connect" errors from the load test clients.

    确保Web服务器足够已定义侦听器避免负载测试客户机端出现“连接失败错误

    youdao

  • Monitoring provides the ability to measure the response time of the application servlets, JSPs and EJBs against the backend resources, and against those measured by the load test clients.

    监视提供能力测量针对资源应用程序servletJSPEJB 的响应时间测量针对那些负载测试客户机测量的东西的响应时间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定