Based on seismic lines, hydrocarbon source rock, lithology, thermal stream and test data, a two dimensional forward model of the basin has been made.
以地震主测线为格架,结合烃源岩、岩性、热流、测试分析资料为依据,采用正演法开展二维盆地模拟工作。
Based on seismic lines, hydrocarbon source rock, lithology, thermal stream and test data, a two dimensional forward model of the basin has been made.
以地震主测线为格架,结合烃源岩、岩性、热流、测试分析资料为依据,采用正演法开展二维盆地模拟工作。
应用推荐