-
Abstract: The dispute of liquidated damage for delay (LAD) is not uncommon in construction and engineering.
[摘要]有关逾期违约金争议是较为常见的工程施工合同争议类型。
youdao
-
Abstract: The dispute of liquidated damage for delay (LAD) is not uncommon in construction and engineering.
[摘要]有关逾期违约金争议是较为常见的工程施工合同争议类型。
youdao