After the workpiece has been cleaned, liquid penetrant is applied in a suitable manner so as to form a film of the penetrant over the surface for at least 13mm beyond the area being inspected.
待工件清洁干净后,渗透剂就需要以一种合适的方式施加,以便在超过被检区域至少13毫米的表面上获得一薄层渗透剂。
Regardless of the type penetrant used, and regardless of other variations in the basic process, liquid-penetrant inspection requires at least five essential steps.
无论使用何种渗透剂,也无论在基本操作中其他的参数如何,渗透探伤都至少需要以下五个步骤。
All surfaces of a workpiece must be thoroughly cleaned and completely dried before it is subjected to liquid-penetrant inspection.
工件的所有表面都必须被彻底清理,并且在进行渗透探伤前应完全干燥。
All surfaces of a workpiece must be thoroughly cleaned and completely dried before it is subjected to liquid-penetrant inspection.
工件的所有表面都必须被彻底清理,并且在进行渗透探伤前应完全干燥。
应用推荐