The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.
建立了热轧无缝钢管主生产计划问题的混合整数线性规划模型。
On the basis of analyzing in the demand, transport, inventory and production in supply chain, the paper puts forward a random linear planning model solving supply chain optimization.
在对供应链中需求、运输、库存、产品生产分析的基础上,提出了一种解决厂家供应链整体优化的随机线性规划模型。
A nonlinear programming model of production planning with demand constraints is built up and then transformed into a linear programming model by adding constraints.
首先根据实际需要建立车间生产计划的含需求约束的非线性规划模型,然后为求解方便通过引进约束将其转化成线性规划模型。
Using the linear model with measurement error paddy production was estimated by means of NDVI.
用含测量误差的线性模型,由植被指数(NDVI)估计稻谷产量。
Small and medium coal mining enterprise; major safety accident; Linear probability model; Critical production scope;
中小煤矿企业;重大生产事故;线性概率模型;安全生产限额;
Non-linear model, Cobb-Douglas production function, has many advantages and is suitable for analyzing agricultural production.
非线性模型—柯布道格拉斯生产函数具有很多优点,非常适合农业生产的分析。
Non-linear model, Cobb-Douglas production function, has many advantages and is suitable for analyzing agricultural production.
非线性模型—柯布道格拉斯生产函数具有很多优点,非常适合农业生产的分析。
应用推荐