Israel wants to go on building about 3,000 homes and limit construction for several months.
以色列希望继续建设3,000户定居点,限制建设几个月时间。
The plan calls for construction sites to limit construction activity that creates large amounts of dust, as well as asks industrial enterprises to reduce emissions, during hazardous pollution days.
该应急方案规定,严重污染日时,建筑施工工地应减少产生大量灰尘的施工行为,并要求工业企业减少排放。
Measures have been taken to limit the damage, and some tourist amenities such as parking lots destroyed. Regulations now forbid any new construction within 500 metres of the site.
相关部门已推出了措施阻止破坏继续,拆除了一些公共设施如停车场。条例还禁止在长城500米范围内新建建筑。
So if Maple City were to establish strict laws that limit new building construction, these laws will have no effect on average housing prices.
所以如果MapleCity建立限制新的高层建筑的法令的话,这种法令不会影响平均房价。
Those who do not make the corrections within the time limit, shall be ordered to stop construction, and can be imposed with penalty simultaneously.
逾期不改正的,责令停止施工,可以并处罚款。
Reductions in construction jobs limit growth, further depressing housing markets.
承包工程的减少抑制了增长,进一步使得房市惨淡。
At the same time, it also gives the contract and limit the rights and obligations of the parties to ensure the smooth progress of construction activities, quality and quantity objectives.
同时,它也赋予和限制了合同双方当事人的权利和义务,确保建筑活动顺利进行,保质保量的完成目标。
The method of limit length of cable advantages in simple construction, easy operation, and no readjustment, it can be used for reference in the construction control.
通过比较定长扣索法的优点在于施工简便,操作容易,节段安装中不需要调整扣索索力,从而对施工控制有一定的参考意义。
We wanted to limit grey energy as much as possible in the use of materials and construction processes.
我们想要在建材使用和施工中尽可能地限制污染产生。
The national construction ministry once below limit the use of expansive pearlite as insulation slurry.
国家建设部一度下文限制使用膨胀珍珠岩作为内保温浆料。
Limit pressure can provide pipeline design parameters and the guarantee of safely operating, thus saving the construction cost and reducing danger of burst accidents.
管道极限压力的确定能为管道设计提供优化参数和安全运行保障,节约建设成本,降低危险系数。
Mills start with a hard, strong construction grade wood like Douglas fir, and then preservative chemicals are injected under pressure to limit the effects of insect and rot damage.
米尔斯开始用硬,强固的构造像花旗松级木材,然后防腐剂化学品的压力之下,以限制昆虫和腐烂造成的损害减少注射。
Dave Noonan, the national secretary of the Construction, Forestry, Mining and Energy Union, says Australia must limit the influx of foreign workers.
建筑、林业、矿产和能源联合会全国事务长戴夫·努南说,澳大利亚必须限制外国工人涌入。
According the key of safety monitoring of construction of deep pit, the monitoring content and the correlation limit alarming value is ascertained combining with the actual problem.
文章从明确深基坑施工安全监测的关键出发,确定了监测内容和相关极限报警值,用工程实例进行了阐述。
There are, at present, three difficulties in western countrysides, such as short of funds, great difficulty in construction and long time limit for a project.
阐述了目前西部农村建桥的三大困难:建桥资金缺、施工难度大、建设工期长;
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
Hence, research on limit displacement for every stage of tunnel construction can offer favorable theoretic basis for decision on design and construction of tunnel of the kind.
施工中各阶段隧道极限位移的研究,可为该种条件下隧道设计和施工决策提供有利的技术支持。
Advanced construction methods are propitious to improve quality and security of construction, shorten the time limit for a project, lower the cost of construction.
先进的施工方法有利于提高结构的施工质量和安全性,并可有效的缩短工期和降低施工成本。
However, the externality of forest ecological effect makes its value cannot be compensated, which becomes principally limit factor for forest ecological construction.
但由于森林生态效益的外在性,使得其价值补偿无法实现,从而成为我国森林生态建设的根本性制约因素。
The paper detailed discusses the cause, meaning, controlling program, the dealing principle of time limit for a project and cost of change in the work, and discussing construction scheme optimum.
本文就工程变更的原因、意义、控制程序、变更工期和价格的处理原则、施工方案的优化进行了较为详尽的论述。
Through aimed construction management the design can meet the requirements and the limit time is shortened, which reduce the construction cost and got good economic benefit.
并通过有针对性地组织施工,使其既能满足设计要求,又能缩短工期、降低施工成本,取得良好的经济效益。
The research is expected to present a valid risk-management method on the time limit for a construction project.
论文的研究,期望对建筑工程项目的工期风险管理提供一种有效的方法。
The construction measure can ensure construction quality, short the time limit for a project, decrease the cost of construction and insure construction safety.
这种施工方法保证了施工质量,缩短了施工工期,降低了施工成本,做到了施工安全。
The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.
进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。
The construction technology of low liquid limit silt has broad prospects and notable economic effects.
低液限粉土填料路堤施工技术具有广阔的推广前景,有十分显著的经济效益。
Because of length limit, the single tubular bus requires welding several tubular buses during construction, resulting in large amount of welding load.
管母的单根长度有限,在施工中要将几根管母焊接起来,焊接的数量较多。
Supply chain management and e-business are efficient ways for construction enterprises to reduce cost of, shorten time limit for and improve quality of engineering projects.
供应链管理和电子商务是建筑企业节约成本、缩短工期、提高质量的有效方法。
Jinan Viaduct is along a river, limited by the location circumstance, the routine construction method can't up to the investor's require on the cost and the time limit for the project.
济南顺河高架桥由于受地埋位置的局限,按常规施工方案难以满足业主在工期、成本等方面的要求。
Jinan Viaduct is along a river, limited by the location circumstance, the routine construction method can't up to the investor's require on the cost and the time limit for the project.
济南顺河高架桥由于受地埋位置的局限,按常规施工方案难以满足业主在工期、成本等方面的要求。
应用推荐